Skip to content
Halloween 2026Explore the community map

Community

San Francisco Bay Ferry Commissions 12-Megawatt-Hour Battery Charging Pier at Alameda Seaplane Lagoon Terminal

Modular shore-side LFP energy storage plaza and dual-plug megawatt charging connectors at 1901 Ferry Point power zero-emission electric commuter catamarans across the Bay.

By Bay Area Chronicle
Published · 2 min read

Maritime engineers on a concrete ferry pier watching a dual-plug megawatt shore-power cable connect to a white-and-blue battery-electric catamaran ferry with the San Francisco skyline across the bay at Alameda Seaplane Lagoon
San Francisco Bay Ferry maritime engineers test the dual-plug megawatt shore-power connector on the new 12-megawatt-hour battery charging pier at the Alameda Seaplane Lagoon Terminal.
Your listening Queue & catch up
Unheard stories first, timed at 1×. Your selections stay first.

Add a story or build a catch-up queue to start listening.

Marine engineers with the Water Emergency Transportation Authority (WETA), operator of San Francisco Bay Ferry, and clean-energy specialists from Alameda Municipal Power commissioned a 12-megawatt-hour (MWh) shore-side lithium-iron-phosphate (LFP) battery storage plant and a dual-cord 4.5-megawatt Megawatt Charging System (MCS) berth on Sunday afternoon at the Seaplane Lagoon Ferry Terminal at 1901 Ferry Point at Alameda Point. Serving thousands of daily transbay commuters traveling between Alameda's former naval air station and the Downtown San Francisco Ferry Building in twenty minutes, the high-power charging pier is a cornerstone of WETA's Rapid Electric Emission-Free (REEF) ferry program.

Inside a flood-elevated architectural enclosure just inland from the passenger gangway plaza, eight liquid-cooled battery containers continuously draw 100 percent carbon-free municipal electricity from Alameda Municipal Power at a steady 900-kilowatt rate, avoiding costly underwater distribution cable upgrades across the Oakland Estuary. When a 400-passenger battery-electric catamaran docks at the Seaplane Lagoon float, an automated articulated cable-management boom extends two liquid-cooled 1,500-volt DC MCS plugs to the vessel's port-side charging manifold.

During a ten-minute passenger disembarkation and boarding window, the shore-side battery bank transfers 750 kilowatt-hours of propulsion energy—enough for a complete round-trip transbay crossing at 27 knots—before retracting automatically. The 12-MWh plant also serves as an emergency microgrid hub for WETA's adjacent Ron Cowan Operations and Maintenance Facility during a regional earthquake.

The $13.8 million maritime charging facility was funded through California State Transportation Agency TIRCP grants and Federal Transit Administration ferry funds. Sailing schedules are posted on the San Francisco Bay Ferry Official Portal.

Sources

Comments (0)

No comments yet. Be the first to share a thought on this story.

The free newsletter

The Bay Area, in your inbox.

The local stories worth knowing, delivered once a week.

From Tri-Valley, Lamorinda, Napa Valley, Walnut Creek, and East Bay.

Get the newsletter

Free to read. Unsubscribe anytime.

More local stories